DS some querries

This topic has expert replies
Legendary Member
Posts: 876
Joined: Thu Apr 10, 2008 8:14 am
Thanked: 13 times

DS some querries

by ketkoag » Sat Mar 21, 2009 10:56 am
Q1) What is the median number of employees assigned per project for the projects at
Company Z?
(1) 25 percent of the projects at Company Z have 4 or more employees assigned to
each project.
(2) 35 percent of the projects at Company Z have 2 or fewer employees assigned to
each project

Why the OA is C. Please explain


Q2)One kilogram of a certain coffee blend consists of x kilogram of type I coffee and y
kilogram of type II coffee. The cost of the blend is C dollars per kilogram, where C =
6.5x + 8.5y. Is x < 0.8?
(1) y > 0.15
(2) C >=7.30

OA is b how??

User avatar
Legendary Member
Posts: 543
Joined: Fri Jan 18, 2008 1:01 am
Thanked: 43 times
GMAT Score:580

by codesnooker » Sat Mar 21, 2009 12:02 pm
Q2)One kilogram of a certain coffee blend consists of x kilogram of type I coffee and y
kilogram of type II coffee. The cost of the blend is C dollars per kilogram, where C =
6.5x + 8.5y. Is x < 0.8?
(1) y > 0.15
(2) C >=7.30

OA is (B) because...

Taking 1st statement, if y=0.16 then x>0.8 but if y=0.3 then x<0.8

Hence insufficient.

Taking 2nd statement,

C = 6.5x + 8.5y

According to second statement, the minimum cost of blended coffee would be 7.30

Let's check the value of C when x = 0.8

C = 6.5*0.8 + 8.5*0.2 = 6.9

Now, let's suppose that x>0.8, then by placing x = 0.81, the value of C is,

C = 6.5*0.81 + 8.5*0.19 = 6.88

Since by increasing the value of x reduces is the value of C and minimum value of C should be equal to 7.3, therefore, x should be always less than 0.8

Hence II statement is alone sufficient. Choose (B).

Hope this clears your doubt.

Master | Next Rank: 500 Posts
Posts: 168
Joined: Thu Nov 13, 2008 4:34 am
Location: Pittsburgh
Thanked: 9 times

by Tryingmybest » Mon Mar 23, 2009 7:24 am
IMO q1) Ans must be E.

As we dont know how the rest of the 40% employees are allocated.
Please correct me if I am wrong.

GMAT/MBA Expert

User avatar
GMAT Instructor
Posts: 2621
Joined: Mon Jun 02, 2008 3:17 am
Location: Montreal
Thanked: 1090 times
Followed by:355 members
GMAT Score:780

by Ian Stewart » Mon Mar 23, 2009 7:30 am
Tryingmybest wrote:IMO q1) Ans must be E.

As we dont know how the rest of the 40% employees are allocated.
Please correct me if I am wrong.
We do know, in fact. If 25% have four or more employees, and 35% have two or fewer employees, then the remaining 40% must have exactly three employees. That ensures that the median will be 3.
For online GMAT math tutoring, or to buy my higher-level Quant books and problem sets, contact me at ianstewartgmat at gmail.com

ianstewartgmat.com

Newbie | Next Rank: 10 Posts
Posts: 3
Joined: Wed Mar 04, 2009 9:56 am

by rdoy02 » Mon Mar 23, 2009 9:00 am
What is the rule for this?

Is it the middle 20% must be the median?

Junior | Next Rank: 30 Posts
Posts: 15
Joined: Fri Mar 20, 2009 8:59 am
GMAT Score:600

by 2ndShot » Mon Mar 23, 2009 11:43 am
The median is the number that stands in the middle, if you order the number from lowest to greatest. If there are two numbers in the middle, its their average.

For the problem above lets assume you have 100 projects. Then you get

number of projects number of employees
25 >=4
40 3
35 <=2

So, from the statements you can be sure that the "number in the middle" is 3.
(Note that the table above is a frequency distribution, so you have 35*(2 or less), 25*(4 or more) and 40*3)

Master | Next Rank: 500 Posts
Posts: 168
Joined: Thu Nov 13, 2008 4:34 am
Location: Pittsburgh
Thanked: 9 times

by Tryingmybest » Mon Mar 23, 2009 12:42 pm
Ian- Thanks for the explanation!!