work order Post Tue Feb 21, 2012 3:43 pm
Elapsed Time: 00:00
  • Lap #[LAPCOUNT] ([LAPTIME])
    Working alone at its own constant rate, a machine seals K cartons in 8 hours, and working alon at its own constant rate, a second machine seals K cartons in 4 hours. If the two machines, each working at its won constant rate and for the same period of time, together sealed a certain number of cartons, what percent of the cartons were sealed by the machine working at the faster rate?

    A. 25%
    B. 33 and 1/3 %
    C. 50%
    D. 66 and 2/3 %
    E. 75%

    Need free GMAT or MBA advice from an expert? Register for Beat The GMAT now and post your question in these forums!
    pemdas GMAT Titan Default Avatar
    Joined
    15 Apr 2011
    Posted:
    1086 messages
    Followed by:
    20 members
    Thanked:
    150 times
    Post Tue Feb 21, 2012 4:09 pm
    two machines, X and Y
    their speeds, X speed 1/8 and Y speed 1/4 (the speed of Y greater)
    combined speed by X&Y will be (1/4 +1/8)=3/8
    find the required, i.e. ratio faster speed machine(Y)/combined speed machines(X&Y)=1/4 : 3/8=1/4 *8/3=2/3 or 66%
    d
    dreamv wrote:
    Working alone at its own constant rate, a machine seals K cartons in 8 hours, and working alon at its own constant rate, a second machine seals K cartons in 4 hours. If the two machines, each working at its won constant rate and for the same period of time, together sealed a certain number of cartons, what percent of the cartons were sealed by the machine working at the faster rate?

    A. 25%
    B. 33 and 1/3 %
    C. 50%
    D. 66 and 2/3 %
    E. 75%

    _________________
    Success doesn't come overnight!

    Thanked by: dreamv

    GMAT/MBA Expert

    Post Tue Feb 21, 2012 5:33 pm
    dreamv wrote:
    Working alone at its own constant rate, a machine seals K cartons in 8 hours, and working alon at its own constant rate, a second machine seals K cartons in 4 hours. If the two machines, each working at its won constant rate and for the same period of time, together sealed a certain number of cartons, what percent of the cartons were sealed by the machine working at the faster rate?

    A. 25%
    B. 33 and 1/3 %
    C. 50%
    D. 66 and 2/3 %
    E. 75%
    The slower machine takes TWICE AS LONG to produce K cartons.
    TWICE AS LONG means HALF AS FAST.
    Thus, for every 2 cartons produced by the faster machine, the slower machine produces 1 carton.
    Thus, of every 3 cartons produced, the fraction produced by the faster machine = 2/3 = 66 2/3%.

    The correct answer is D.

    _________________
    Mitch Hunt
    GMAT Private Tutor and Instructor
    GMATGuruNY@gmail.com
    If you find one of my posts helpful, please take a moment to click on the "Thank" icon.
    Contact me about long distance tutoring!

    Thanked by: dreamv
    Free GMAT Practice Test How can you improve your test score if you don't know your baseline score? Take a free online practice exam. Get started on achieving your dream score today! Sign up now.

    Best Conversation Starters

    1 varun289 34 topics
    2 killerdrummer 22 topics
    3 sana.noor 21 topics
    4 guerrero 14 topics
    5 sanaa.rizwan 14 topics
    See More Top Beat The GMAT Members...

    Most Active Experts

    1 image description Brent@GMATPrepNow

    GMAT Prep Now Teacher

    200 posts
    2 image description GMATGuruNY

    The Princeton Review Teacher

    135 posts
    3 image description Jim@StratusPrep

    Stratus Prep

    106 posts
    4 image description Anju@Gurome

    Gurome

    56 posts
    5 image description Jon@Admissionado

    Admissionado

    44 posts
    See More Top Beat The GMAT Experts