Two machines, Y and Z, work at constant rates producing identical items. Machine Y produces 3 items in the same time Machine Z produces 2 items. If machine Y takes 9 minutes to produce a batch of items, how many minutes does it take for machine Z to produce the same number of items?
A. 6
B. 9
C. 9(1/2)
D. 12
E. 13(1/2)
Source:GMATPrep EP 2
OA:E
Two machines, Y and Z, work at constant
This topic has expert replies
GMAT/MBA Expert
- Brent@GMATPrepNow
- GMAT Instructor
- Posts: 16207
- Joined: Mon Dec 08, 2008 6:26 pm
- Location: Vancouver, BC
- Thanked: 5254 times
- Followed by:1268 members
- GMAT Score:770
Let's assign a NICE VALUE to the number of items in a batch and go from there.NandishSS wrote:Two machines, Y and Z, work at constant rates producing identical items. Machine Y produces 3 items in the same time Machine Z produces 2 items. If machine Y takes 9 minutes to produce a batch of items, how many minutes does it take for machine Z to produce the same number of items?
A. 6
B. 9
C. 9(1/2)
D. 12
E. 13(1/2)
Machine Y produces 3 items in the same time Machine Z produces 2 items
Let's say there are 3 items in a batch.
Machine Y takes 9 minutes to produce a batch of items
So, machine Y takes 9 minutes to produce 3 items
From the other information, we can conclude that machine Z takes 9 minutes to produce 2 items.
In other words, machine Z produces 1 item every 4.5 minutes.
So, if a batch is 3 items, then the time it takes machine Z to produce a batch = (3)(4.5) = 13.5 minutes
Answer: E
Cheers,
Brent
- DavidG@VeritasPrep
- Legendary Member
- Posts: 2663
- Joined: Wed Jan 14, 2015 8:25 am
- Location: Boston, MA
- Thanked: 1153 times
- Followed by:128 members
- GMAT Score:770
Note, also that rate and time have a reciprocal relationship. If I'm running at 2 times your speed, I'll cover the same distance in 1/2 the time. Similarly,NandishSS wrote:Two machines, Y and Z, work at constant rates producing identical items. Machine Y produces 3 items in the same time Machine Z produces 2 items. If machine Y takes 9 minutes to produce a batch of items, how many minutes does it take for machine Z to produce the same number of items?
A. 6
B. 9
C. 9(1/2)
D. 12
E. 13(1/2)
Source:GMATPrep EP 2
OA:E
If one machine (Y) is working at 3/2 the rate of another machine (Z), it will take 2/3 as much time as the other machine. Y completes the task in 9 minutes. If 9 = (2/3)T, then T = 13.5, or E
- GMATGuruNY
- GMAT Instructor
- Posts: 15539
- Joined: Tue May 25, 2010 12:04 pm
- Location: New York, NY
- Thanked: 13060 times
- Followed by:1906 members
- GMAT Score:790
Machine Y produces 3 items in the same time Machine Z produces 2 items.NandishSS wrote:Two machines, Y and Z, work at constant rates producing identical items. Machine Y produces 3 items in the same time Machine Z produces 2 items. If machine Y takes 9 minutes to produce a batch of items, how many minutes does it take for machine Z to produce the same number of items?
A. 6
B. 9
C. 9(1/2)
D. 12
E. 13(1/2)
Implication:
(Y's rate)/(Z's rate) = 3/2.
Rate and time are RECIPROCALS.
Thus:
(Y's time)/(Z's time) = 2/3.
Rephrasing this time ratio, we get:
(Z's time) = (3/2)(Y's time).
Since Y takes 9 minutes to produce a batch, the time for Z to produce a batch = (3/2)(9) = 13.5 minutes.
The correct answer is E.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.
As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.
For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.
As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.
For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
-
- GMAT Instructor
- Posts: 2630
- Joined: Wed Sep 12, 2012 3:32 pm
- Location: East Bay all the way
- Thanked: 625 times
- Followed by:119 members
- GMAT Score:780
Let's say that each machine produces x items. We know that
Work = Rate * Time, so
x = 3 * (Y's time)
x = 2 * (Z's time)
and
3 * (Y's time) = 2 * (Z's time)
so (Z's time) = (3/2) * (Y's time), and from there it's a snap
Work = Rate * Time, so
x = 3 * (Y's time)
x = 2 * (Z's time)
and
3 * (Y's time) = 2 * (Z's time)
so (Z's time) = (3/2) * (Y's time), and from there it's a snap