Machine A and B

This topic has expert replies
Moderator
Posts: 7187
Joined: Thu Sep 07, 2017 4:43 pm
Followed by:23 members

Machine A and B

by BTGmoderatorDC » Wed Sep 13, 2017 3:41 am
Machine A can do a job in 24 hours at a constant rate. If Machine A does the job for 8 hours and Machine B does the rest of the job, which works at 2/3 constant rate of Machine A. How long will it take for Machine B alone to do the rest of the job?

A. 12hrs
B. 16hrs
C. 24hrs
D. 28hrs
E. 32hrs

Is there a strategic approach to this? Experts help please. Thanks

OA C

User avatar
GMAT Instructor
Posts: 15539
Joined: Tue May 25, 2010 12:04 pm
Location: New York, NY
Thanked: 13060 times
Followed by:1906 members
GMAT Score:790

by GMATGuruNY » Wed Sep 13, 2017 4:01 am
lheiannie07 wrote:Machine A can do a job in 24 hours at a constant rate. If Machine A does the job for 8 hours and Machine B does the rest of the job, which works at 2/3 constant rate of Machine A. How long will it take for Machine B alone to do the rest of the job?

A. 12hrs
B. 16hrs
C. 24hrs
D. 28hrs
E. 32hrs
Let the job = 72 widgets.

Since A takes 24 hours to complete the job, A's rate = w/t = 72/24 = 3 widgets per hour.
At a rate of 3 widgets per hour, the work produced by A in 8 hours = rt = 3*8 = 24 widgets.

Remaining work = 72-24 = 48 widgets.
Since B's rate is 2/3 of A's rate, B's rate = (2/3)(3) = 2 widgets per hour.
At a rate of 2 widgets per hour, the time for B to produce the remaining 48 widgets = w/r = 48/2 = 24 hours.

The correct answer is C.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3

User avatar
Legendary Member
Posts: 2663
Joined: Wed Jan 14, 2015 8:25 am
Location: Boston, MA
Thanked: 1153 times
Followed by:128 members
GMAT Score:770

by DavidG@VeritasPrep » Wed Sep 13, 2017 6:07 am
lheiannie07 wrote:Machine A can do a job in 24 hours at a constant rate. If Machine A does the job for 8 hours and Machine B does the rest of the job, which works at 2/3 constant rate of Machine A. How long will it take for Machine B alone to do the rest of the job?

A. 12hrs
B. 16hrs
C. 24hrs
D. 28hrs
E. 32hrs

Is there a strategic approach to this? Experts help please. Thanks

OA C
If machine A can complete the job in 24 hours, and it works for 8 hours, then it has completed 8/24 or 1/3 of the job, leaving 2/3 of the job for B to complete.

If Machine A's rate was 1 job/24 hours, or 1/24, and B's rate is 2/3 of this, then B's rate is (2/3) * (1/24) = 1/36.

If Machine B works for T hours at a rate of 1/36 and must complete 2/3 of a job, we get the following equation: (1/36) * T = 2/3 --> T = 24; The answer is C
Veritas Prep | GMAT Instructor

Veritas Prep Reviews
Save $100 off any live Veritas Prep GMAT Course

User avatar
Legendary Member
Posts: 2663
Joined: Wed Jan 14, 2015 8:25 am
Location: Boston, MA
Thanked: 1153 times
Followed by:128 members
GMAT Score:770

by DavidG@VeritasPrep » Wed Sep 13, 2017 6:10 am
lheiannie07 wrote:Machine A can do a job in 24 hours at a constant rate. If Machine A does the job for 8 hours and Machine B does the rest of the job, which works at 2/3 constant rate of Machine A. How long will it take for Machine B alone to do the rest of the job?

A. 12hrs
B. 16hrs
C. 24hrs
D. 28hrs
E. 32hrs

Is there a strategic approach to this? Experts help please. Thanks

OA C
Another approach. If Machine A has worked for 8 hours, and it takes Machine A 24 hours to complete the job, it would take Machine A an additional 16 hours to finish the job alone.

Rate and Time have a reciprocal relationship. If B's rate is 2/3 of A's rate, then it would take B 3/2 of A's Time to complete the job. If it would have taken A 16 hours to complete the job, it would take B 16*(3/2) or 24 hours. The answer is C.
Veritas Prep | GMAT Instructor

Veritas Prep Reviews
Save $100 off any live Veritas Prep GMAT Course

GMAT/MBA Expert

User avatar
GMAT Instructor
Posts: 7242
Joined: Sat Apr 25, 2015 10:56 am
Location: Los Angeles, CA
Thanked: 43 times
Followed by:29 members

by Scott@TargetTestPrep » Wed Sep 20, 2017 2:39 pm
lheiannie07 wrote:Machine A can do a job in 24 hours at a constant rate. If Machine A does the job for 8 hours and Machine B does the rest of the job, which works at 2/3 constant rate of Machine A. How long will it take for Machine B alone to do the rest of the job?

A. 12hrs
B. 16hrs
C. 24hrs
D. 28hrs
E. 32hrs
The rate of Machine A is 1/24, so in 8 hours, 1/3 of the job is completed, and thus 2/3 of the job is left to be completed.

If the rate of Machine B is 2/3 that of Machine A, then the rate of Machine B is (2/3)(1/24) = 1/36.

Thus, it will take Machine B (2/3)/(1/36) = 2/3 x 36 = 24 hours to complete the rest of the job.

Answer: C

Scott Woodbury-Stewart
Founder and CEO
[email protected]

Image

See why Target Test Prep is rated 5 out of 5 stars on BEAT the GMAT. Read our reviews

ImageImage

Moderator
Posts: 7187
Joined: Thu Sep 07, 2017 4:43 pm
Followed by:23 members

by BTGmoderatorDC » Fri Sep 22, 2017 1:07 pm
Thank you so much for the solution, but is there an easier way to solve this?