Three machines, K, M, and P, working simultaneously
and independently at their respective constant rates,
can complete a certain task in 24 minutes. How long
does it take Machine K, working alone at its constant
rate, to complete the task?
(1) Machines M and P, working simultaneously and
independently at their respective constant rates,
can complete the task in 36 minutes.
(2) Machines K and P, working simultaneously and
independently at their respective constant rates,
can complete the task in 48 minutes.
OG answer is A ... can someone shed some light on how to solve this problem? thanks!
Three machines, K, M, and P, working simultaneously
This topic has expert replies
- chufus
- Master | Next Rank: 500 Posts
- Posts: 102
- Joined: Thu Jul 21, 2011 2:22 am
- Location: Lahore, Pakistan
- Thanked: 4 times
- Followed by:1 members
Here is the thing. Always remember that rates are additive. Lets rework the original statement.
Let Rate of K be = 1/K
Let rate of M be = 1/M
Let rate of N be = 1/N
We are assuming here that the complete job = 1 . It will work for all positive number. You can take 10 or 100 if you like. When we set the equation up, you will see it does not matter. So we know that together to complete the One job it takes 24 minutes. So rate of K, M and N would add up to 1/24.
So:
1/k+1/m+1/n = 1/24
Now lets look at our statement.
A. It gives us the value of (1/m + 1/n) = 1/36
Substitute it in the equation and solve for 1/k = 72
SUFFICIENT
B. its gives us the value of (1/k+1/p)
We still can't solve for 1/k
INSUFFICIENT
Pick A
Let Rate of K be = 1/K
Let rate of M be = 1/M
Let rate of N be = 1/N
We are assuming here that the complete job = 1 . It will work for all positive number. You can take 10 or 100 if you like. When we set the equation up, you will see it does not matter. So we know that together to complete the One job it takes 24 minutes. So rate of K, M and N would add up to 1/24.
So:
1/k+1/m+1/n = 1/24
Now lets look at our statement.
A. It gives us the value of (1/m + 1/n) = 1/36
Substitute it in the equation and solve for 1/k = 72
SUFFICIENT
B. its gives us the value of (1/k+1/p)
We still can't solve for 1/k
INSUFFICIENT
Pick A
GMAT/MBA Expert
- Anurag@Gurome
- GMAT Instructor
- Posts: 3835
- Joined: Fri Apr 02, 2010 10:00 pm
- Location: Milpitas, CA
- Thanked: 1854 times
- Followed by:523 members
- GMAT Score:770
The question body says that 1 minute task of 1/K + 1/M + 1/P = 1/24...Equation 1factor26 wrote:Three machines, K, M, and P, working simultaneously and independently at their respective constant rates, can complete a certain task in 24 minutes. How long does it take Machine K, working alone at its constant rate, to complete the task?
(1) Machines M and P, working simultaneously and independently at their respective constant rates,
can complete the task in 36 minutes.
(2) Machines K and P, working simultaneously and independently at their respective constant rates,
can complete the task in 48 minutes.
OG answer is A ... can someone shed some light on how to solve this problem? thanks!
We have to find 1/K
(1) 1/M + 1/P = 1/36
Put the above value in equation 1, 1/K + 1/36 = 1/24, we can find the value of 1/K from here; SUFFICIENT.
(2) 1/K + 1/P = 1/48, but we cannot find 1/K from this; NOT sufficient.
The correct answer is A.
Anurag Mairal, Ph.D., MBA
GMAT Expert, Admissions and Career Guidance
Gurome, Inc.
1-800-566-4043 (USA)
Join Our Facebook Groups
GMAT with Gurome
https://www.facebook.com/groups/272466352793633/
Admissions with Gurome
https://www.facebook.com/groups/461459690536574/
Career Advising with Gurome
https://www.facebook.com/groups/360435787349781/
GMAT Expert, Admissions and Career Guidance
Gurome, Inc.
1-800-566-4043 (USA)
Join Our Facebook Groups
GMAT with Gurome
https://www.facebook.com/groups/272466352793633/
Admissions with Gurome
https://www.facebook.com/groups/461459690536574/
Career Advising with Gurome
https://www.facebook.com/groups/360435787349781/
- GMATGuruNY
- GMAT Instructor
- Posts: 15539
- Joined: Tue May 25, 2010 12:04 pm
- Location: New York, NY
- Thanked: 13060 times
- Followed by:1906 members
- GMAT Score:790
Let the task = 72 units.factor26 wrote:Three machines, K, M, and P, working simultaneously
and independently at their respective constant rates,
can complete a certain task in 24 minutes. How long
does it take Machine K, working alone at its constant
rate, to complete the task?
(1) Machines M and P, working simultaneously and
independently at their respective constant rates,
can complete the task in 36 minutes.
(2) Machines K and P, working simultaneously and
independently at their respective constant rates,
can complete the task in 48 minutes.
OG answer is A ... can someone shed some light on how to solve this problem? thanks!
Rate for K+M+P = w/t = 72/24 = 3 units per minute.
In order to determine K's time to complete the task alone, we need to know K's rate.
Question rephrased: What is K's rate?
Statement 1: M+P = 36 minutes.
Rate for M+P = w/t = 72/36 = 2 units per minute.
Since K+M+P = 3 units per minute, and M+P = 2 units per minute, K = 1 unit per minute.
SUFFICIENT.
Statement 2: K+P = 48 minutes.
The time for K+P enables us to determine the rate for K+P and thus the rate for M.
No way to determine K's rate.
INSUFFICIENT.
The correct answer is A.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.
As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.
For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.
As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.
For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
-
- Junior | Next Rank: 30 Posts
- Posts: 12
- Joined: Fri Feb 24, 2012 9:24 pm
- Thanked: 2 times
- Followed by:1 members
- GMAT Score:690
The best way that I know how to explain it, and someone more knowledgeable can correct me if I'm wrong, is to compare it to the question in which you're trying to find the value of one of the three angles inside of a triangle. I believe the scenario is exactly the same, but the math makes a bit more sensesamirpassi wrote:I understand your reasoning but taking it forward, the initial data tells us that:GMATGuruNY wrote:Let the task = 72 units.factor26 wrote:Three machines, K, M, and P, working simultaneously
and independently at their respective constant rates,
can complete a certain task in 24 minutes. How long
does it take Machine K, working alone at its constant
rate, to complete the task?
(1) Machines M and P, working simultaneously and
independently at their respective constant rates,
can complete the task in 36 minutes.
(2) Machines K and P, working simultaneously and
independently at their respective constant rates,
can complete the task in 48 minutes.
OG answer is A ... can someone shed some light on how to solve this problem? thanks!
Rate for K+M+P = w/t = 72/24 = 3 units per minute.
In order to determine K's time to complete the task alone, we need to know K's rate.
Question rephrased: What is K's rate?
Statement 1: M+P = 36 minutes.
Rate for M+P = w/t = 72/36 = 2 units per minute.
Since K+M+P = 3 units per minute, and M+P = 2 units per minute, K = 1 unit per minute.
SUFFICIENT.
Statement 2: K+P = 48 minutes.
The time for K+P enables us to determine the rate for K+P and thus the rate for M.
No way to determine K's rate.
INSUFFICIENT.
The correct answer is A.
1/k + 1/m + 1/p = 72/24 = 3 units
Choice-1:
Yes, pretty clear you can solve for K's rate.
Choice-2:
It is true that you cannot use simply this to get the value of K. However, what if you do it in the following way:
Step-1: Plug this into main given equation (1/k + 1/m + 1/p) and get the value of m.
Step-2: Substitute P in terms of K, in the main equation and plug in the value of m received from Step-1.
Step-3: Get the value of K.
Shouldn't the answer be D?
Please explain. Thanks.
For example:
There are three angles inside a triangle, X Y and Z. What is the value of angle Z?
1) X + Y = 108
2) Y + Z = 108
So you'd obviously set up the equation X + Y + Z = 180, right?
So The first statement gives you the value of X + Y, which you substitute in and get the value of 72 for Z, which is SUFFICIENT
But for the second statement, I tried to do the same thing as you the first time I saw this question. This is how I worked it out:
X + Y + Z = 180 again.
Then this time, X = 72, right?
Also, as you did with the machines question, I took the second statement and rearranged it so that Y is in terms of Z, like so:
Y = 108 - Z
I then combined these equations:
72[which is X] + (108 - Z)[which is Y] + Z = 180
If we simplify this down, we get
180 - Z + Z = 180
180 = 180
When I finally started to understand it was when I thought about it logically. The triangle question gave us no constraints on what type of triangle it is, so as much as we'd like to be able to rearrange expressions and plug them back in to find the answer, the fact remains that Z in statement two is some part of that 108 degrees, and we simply do not have the requisite information necessary to deduce what that angle is.
From what I can tell, the situation with the 3 machines is exactly the same. Unless they give you the combined rate along with the rates of the other 2 machines besides K (as they do in statement 1), there is no way to solve it. In statement 1, K can only be the third part of the equation that makes the final task complete in 24 minutes. In statement two, it could be either of the two rates that add up to 48, and there is no way to deduce how that 48 is broken down.
Being able to solve it could be as simple as them adding the stipulation "and K works twice as fast as P" to statement 2, but what they give us just isn't enough to go on.
As I said before, if I'm wrong, hopefully someone will correct me, but I believe these problems go hand in hand, and I've seen the same concept phrased many different ways in my studying.
-
- Junior | Next Rank: 30 Posts
- Posts: 23
- Joined: Tue Jun 28, 2016 6:39 am
- Thanked: 8 times
- Followed by:3 members
- GMAT Score:780
A couple of ways to solve this question:
Logic/Time-Formula approach:
https://www.youtube.com/watch?v=8OGY5xcYqDM
Rates/Algebra approach:
https://www.youtube.com/watch?v=B2PAbu157fw
Logic/Time-Formula approach:
https://www.youtube.com/watch?v=8OGY5xcYqDM
Rates/Algebra approach:
https://www.youtube.com/watch?v=B2PAbu157fw
Email: [email protected]
GMAT/MBA Expert
- Scott@TargetTestPrep
- GMAT Instructor
- Posts: 7249
- Joined: Sat Apr 25, 2015 10:56 am
- Location: Los Angeles, CA
- Thanked: 43 times
- Followed by:29 members
We are given that machines K, M, and P, working simultaneously and independently at their respective constant rates, can complete a certain task in 24 minutes. If we consider the entire task to be equal to 1, and the time in minutes for machines K, M, and P to complete the task to be k, m, and p, respectively, then the rates of machines K, M, and P are:factor26 wrote:Three machines, K, M, and P, working simultaneously
and independently at their respective constant rates,
can complete a certain task in 24 minutes. How long
does it take Machine K, working alone at its constant
rate, to complete the task?
(1) Machines M and P, working simultaneously and
independently at their respective constant rates,
can complete the task in 36 minutes.
(2) Machines K and P, working simultaneously and
independently at their respective constant rates,
can complete the task in 48 minutes.
1/k = rate of machine K to complete the task
1/m = rate of machine M to complete the task
1/p = rate of machine P to complete the task
Since it takes machines K, M, and P, working simultaneously and independently, 24 minutes, the combined rate of machines K, M, and P is 1 task per 24 minutes. That is:
1/k + 1/m + 1/p = 1/24
We need to determine how long it takes machine K to complete the task, or in other words, the value of k. Since 1/k + 1/m + 1/p = 1/24, the rate of machine K is:
1/k = 1/24 - 1/m - 1/p
1/k = 1/24 - (1/m + 1/p)
Thus, if we can determine the value of (1/m + 1/p), we can determine the value of 1/k and hence the value of k.
Statement One Alone:
Machines M and P, working simultaneously and independently at their respective constant rates, can complete the task in 36 minutes.
From statement one we know:
1/m + 1/p = 1/36
Thus, the rate for machine K to complete the task is 1/24 - 1/36 = 3/72 - 2/72 = 1/72, and therefore, the time for machine K to complete the task is 72 minutes.
Statement one alone is sufficient to answer the question. We can eliminate answer choices B, C, and E.
Statement Two Alone:
Machines K and P, working simultaneously and independently at their respective constant rates, can complete the task in 48 minutes.
From statement two we know:
1/k + 1/p = 1/48
Since we don't know the value of p, this is not enough information to determine the value of k.
Statement two alone is not sufficient to answer the question.
Answer: A
Scott Woodbury-Stewart
Founder and CEO
[email protected]
See why Target Test Prep is rated 5 out of 5 stars on BEAT the GMAT. Read our reviews
-
- GMAT Instructor
- Posts: 2630
- Joined: Wed Sep 12, 2012 3:32 pm
- Location: East Bay all the way
- Thanked: 625 times
- Followed by:119 members
- GMAT Score:780
Not a great idea to revive five year old topics unless students are asking about them, IMHO