og math # 130

This topic has expert replies
Legendary Member
Posts: 789
Joined: Sun May 06, 2007 1:25 am
Location: Southern California, USA
Thanked: 15 times
Followed by:6 members

og math # 130

by resilient » Sat Mar 08, 2008 8:24 pm
working alone, printers x,y, and z can do a certain printing job, consisitning of a large number of pages, 12, 15, and 18 hours, respectively. What is the ratio of the time it takes printer x to do the job, working at its rate, to time it takes printers y and z to do the job, working together at their individual rates?

a. 4/11
b.1/2
c. 15/22
d.22/15
e.11/4

qa is d. I dont see why C is wrong. I dont see why the solution flips the combined rate of y and z working together. help stuart?
Appetite for 700 and I scraped my plate!

Junior | Next Rank: 30 Posts
Posts: 16
Joined: Mon Feb 11, 2008 3:08 am
Location: chennai
Thanked: 6 times
Followed by:1 members

by siddarthd2919 » Sat Mar 08, 2008 9:08 pm
hi engin, i guess u have seen the intro for the math section in o.g...... there is a formula for work done combined when the individual times are given

1/x+1/y=1/h

where x-----time taken for x to do the work alone

y-----time for y to do the work alone

h-----time taken for the work to be done when both x and y work together.




now for your problem.........



x=12, y=15 z=18

the question is x/h

12/(1/((1/15)+(1/18))


that gives

12/(1/(33/(15*18))

that gives

12*33/(15*18)========22/15........

Legendary Member
Posts: 789
Joined: Sun May 06, 2007 1:25 am
Location: Southern California, USA
Thanked: 15 times
Followed by:6 members

HMM

by resilient » Sun Mar 09, 2008 12:42 am
hmm still not seeing the picture. What I am trying to grasp is why the flip of the combined rates. It doesnt make sense to me and goes against what is taught with mahattan gmat. confused

thank you
Appetite for 700 and I scraped my plate!

Legendary Member
Posts: 645
Joined: Wed Sep 05, 2007 4:37 am
Location: India
Thanked: 34 times
Followed by:5 members

by camitava » Sun Mar 09, 2008 5:38 am
Enginpasa1,
Look if y and z work together, they can do = (1/15 + 1/18) amount in 1 day = (6 + 5) / 90 = 11/90.
so y and z can complete the work in 90/11 days.

On the other hand, x can do the work in 12 day.
So ratio is = 12 : 90/11 = 22/15.

Look the Qs is asking for - What is the ratio of the time it takes printer x to do the job, working at its rate, to time it takes printers y and z to do the job, working together at their individual rates? So you can not do the ratio with the amount of work, u got, that x and (y + z) can do in 1 hr.

1/12 -> Amount of work done by X in 1 hr
11/90 -> Amount of work done by Y and Z in 1 hr . So u can not do the ratio of these numbers. Got me, Enginpasa1?
Correct me If I am wrong


Regards,

Amitava

Legendary Member
Posts: 789
Joined: Sun May 06, 2007 1:25 am
Location: Southern California, USA
Thanked: 15 times
Followed by:6 members

ok

by resilient » Sun Mar 09, 2008 12:38 pm
Thank you friend. I got it. THe problem was coming from not being able to understand the basic formula. I am approaching the problem the way I was taught from Manhattan gmat. I plug in the values according to a chart. In the end the same operatiosn are done. Thank you very much.
Appetite for 700 and I scraped my plate!

User avatar
GMAT Instructor
Posts: 3225
Joined: Tue Jan 08, 2008 2:40 pm
Location: Toronto
Thanked: 1710 times
Followed by:614 members
GMAT Score:800

by Stuart@KaplanGMAT » Sun Mar 09, 2008 3:55 pm
There's another formula you can use when it's exactly 2 workers:

Comb time = (a*b)/(a+b)

In this question, we want the ratio of x working alone to y+z working together.

So:

12 / (15*18)/(15+18)

12 / (270/33)

12*33/270

12*11/90

2*11/15

22/15
Image

Stuart Kovinsky | Kaplan GMAT Faculty | Toronto

Kaplan Exclusive: The Official Test Day Experience | Ready to Take a Free Practice Test? | Kaplan/Beat the GMAT Member Discount
BTG100 for $100 off a full course

Master | Next Rank: 500 Posts
Posts: 140
Joined: Sat Feb 28, 2009 8:51 am
Location: India
Thanked: 14 times
Followed by:3 members

Re: og math # 130

by farooq » Fri Oct 30, 2009 8:08 am
resilient wrote:working alone, printers x,y, and z can do a certain printing job, consisitning of a large number of pages, 12, 15, and 18 hours, respectively. What is the ratio of the time it takes printer x to do the job, working at its rate, to time it takes printers y and z to do the job, working together at their individual rates?

a. 4/11
b.1/2
c. 15/22
d.22/15
e.11/4

qa is d. I dont see why C is wrong. I dont see why the solution flips the combined rate of y and z working together. help stuart?
Lets say total no. of pages that each printer prints are 180.

X prints 180 pages in 12 hours. 15 pages per hour.
Y prints 180 pages in 15 hours. 12 Pages per hour.
Z prints 180 pages in 18 hours. 10 pages per hour.

If Y and Z both work together, they will print 12+10 = 22 pages per hour.

Therefore total no. of hours to print 180 pages by Y and Z will be 180/22.

Time taken by X to print total no. of pages/Time taken by (Y and Z together)to print total no. of pages = 12/(180/22) = 22/15
Regards,
Farooq Farooqui.
London. UK

It is your Attitude, not your Aptitude, that determines your Altitude.

User avatar
Senior | Next Rank: 100 Posts
Posts: 43
Joined: Sat Jan 23, 2010 12:18 am
Thanked: 1 times
Followed by:1 members

by AtifS » Sun Oct 31, 2010 7:05 am
Answer: D
Explanation:
Time printer x takes to do a certain job = 12 hours
Time printers y & x take to do together a certain job is
Rate of job by both y &z =1/15 + 1/18= (15+18)/(15)(18)= (5+6)/(15)(6)= 11/90 --> Time=90/11 hours

Now, the ratio of time printer x takes to do the job to the time printers y & z take to do = 12 /(90/11)= 12*11/90= 2*11/15= 22/15, which is option D.
I am not perfect

User avatar
Newbie | Next Rank: 10 Posts
Posts: 5
Joined: Wed Sep 15, 2010 10:43 pm
Followed by:1 members

by Andijansky » Sun Oct 31, 2010 7:17 pm
seems like D

User avatar
Master | Next Rank: 500 Posts
Posts: 359
Joined: Wed Mar 11, 2009 4:37 am
Location: Kolkata, India
Thanked: 50 times
Followed by:2 members

by Abhishek009 » Thu Nov 04, 2010 1:56 am
farooq wrote:
resilient wrote:working alone, printers x,y, and z can do a certain printing job, consisitning of a large number of pages, 12, 15, and 18 hours, respectively. What is the ratio of the time it takes printer x to do the job, working at its rate, to time it takes printers y and z to do the job, working together at their individual rates?

a. 4/11
b.1/2
c. 15/22
d.22/15
e.11/4

qa is d. I dont see why C is wrong. I dont see why the solution flips the combined rate of y and z working together. help stuart?
Lets say total no. of pages that each printer prints are 180.

X prints 180 pages in 12 hours. 15 pages per hour.
Y prints 180 pages in 15 hours. 12 Pages per hour.
Z prints 180 pages in 18 hours. 10 pages per hour.

If Y and Z both work together, they will print 12+10 = 22 pages per hour.

Therefore total no. of hours to print 180 pages by Y and Z will be 180/22.

Time taken by X to print total no. of pages/Time taken by (Y and Z together)to print total no. of pages = 12/(180/22) = 22/15
Was going to do the problem with this method , but farooq has already posted it. I support his method and answer completely.
Abhishek

Senior | Next Rank: 100 Posts
Posts: 86
Joined: Mon Sep 13, 2010 2:36 pm
Thanked: 29 times
Followed by:2 members
GMAT Score:710

by thebigkats » Sun Nov 07, 2010 1:05 am
fairly straightforward.
Assume total no of pages to be 12*15*18
Speed of X = 12*15*18 / 12 = (15*18) pages per hour
Speed of Y = 12*15*18 / 15 = 12*18 pages per hour
Speed of Z = 12*15*18 / 18 = 12*15 pages per hour

So now to finish the same pages, X will take - (12*15*18) / 15*18 = 12 hours
To finish the same pages both Y and Z will take - (12*15*18) / ((12*18) + (12*15))

Ratio X / (Y+Z) hours = (12*15*18) / (15*18) / ((12*15*18) / ((12*18) + (12*15)))
==> ((12*18) + (12*15) ) / (15*18)
==> 12*33 / 15*18
==> 22/15

Master | Next Rank: 500 Posts
Posts: 102
Joined: Fri Nov 05, 2010 7:10 am
Thanked: 8 times
Followed by:2 members
GMAT Score:690

by gmatjeet » Sun Nov 07, 2010 12:44 pm
hrs taken by x = 12
hrs taken by y = 15
hrs taken by z = 18

lets say y and z together = m hrs

1/m = 1/15 + 1/18

m = 90/11

so hrs taken by y and z together = 90/11

rations of hrs taken by x to hrs taken by y and z together = 12/(90/11) = 22/15

so answer = D

User avatar
Newbie | Next Rank: 10 Posts
Posts: 6
Joined: Fri Sep 24, 2010 2:09 am
Thanked: 10 times
Followed by:2 members

by g.manukrishna » Thu Nov 18, 2010 2:37 am
work done = rate X time taken

for A alone the equation is:

1 = 1/12 X t1

for B and C together

1 = (1/15)+(1/18) X t2

question is what is the ratio of t1 and t2 which is 22/15. So D is the correct option.

User avatar
GMAT Instructor
Posts: 15539
Joined: Tue May 25, 2010 12:04 pm
Location: New York, NY
Thanked: 13060 times
Followed by:1906 members
GMAT Score:790

by GMATGuruNY » Thu Nov 18, 2010 3:50 am
resilient wrote:working alone, printers x,y, and z can do a certain printing job, consisitning of a large number of pages, 12, 15, and 18 hours, respectively. What is the ratio of the time it takes printer x to do the job, working at its rate, to time it takes printers y and z to do the job, working together at their individual rates?

a. 4/11
b.1/2
c. 15/22
d.22/15
e.11/4

qa is d. I dont see why C is wrong. I dont see why the solution flips the combined rate of y and z working together. help stuart?
I think that the easiest approach is to plug in a value for the job in order to determine everyone's respective rates.

Plug in job = 180.
Rate for x = w/t = 180/12 = 15/hour.
Rate for y = w/t = 180/15 = 12/hour.
Rate for z = w/t = 180/18 = 10/hour.
Combined rate of y+z = 12+10 = 22/hour.
Time for y+z = w/r = 180/22 = 90/11.
Ratio of (time x):(time y+z) = 12/(90/11) = 22/15.

The correct answer is D.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3

Newbie | Next Rank: 10 Posts
Posts: 1
Joined: Mon Nov 15, 2010 6:27 pm
Thanked: 2 times

by Swapnil_R » Thu Nov 18, 2010 9:21 am
There is other way to solve such problems.
Printer x alone can do 8.33% (1/12%) work in an hr. Similary y and z can do 6.66% and 5.55% work in an hr respectively.
Together y and z can do 12.22% of work in an hr.

So % work done ratio for x / (y + z) = 8.33/12.22
so time raio = 12.22/8.33 approx 22/15.

Hope this will help to solve such time and speed problems.