Free GMAT Flashcards available for download!

Two DS Question


 
Post new topic   Reply to topic    Beat The GMAT Forum Index -> GMAT Math -> Data Sufficiency
View previous topic :: View next topic  
Author Message
reachac
Moderator


Joined: 22 Feb 2008
Posts: 524

Thanks given: 1
Thanked 9 times in 9 posts


Test Date: 7th Aug
Target GMAT Score: 770
GMAT Score: 780

PostPosted: Wed Jul 23, 2008 5:03 am    Post subject: Two DS Question Reply with quote

Please help with these two questions.[/img]

This post contains an attachment. You must be logged in to download/view this file.
Please login or register as a user.

Back to top


View user's profile Send private message
cubicle_bound_misfit
Really wants to Beat The GMAT!


Joined: 19 May 2008
Posts: 136

Thanks given: 1
Thanked 4 times in 4 posts

Location: Texaco Gas Station
Test Date: 06/30/2008
Target GMAT Score: 730

PostPosted: Wed Jul 23, 2008 6:59 am    Post subject: Reply with quote

Hello Sir,

For the geometry q is the answer D?

Please let me know OA.

regards,

_________________
Cubicle Bound Misfit
Back to top


View user's profile Send private message
reachac
Moderator


Joined: 22 Feb 2008
Posts: 524

Thanks given: 1
Thanked 9 times in 9 posts


Test Date: 7th Aug
Target GMAT Score: 770
GMAT Score: 780

PostPosted: Wed Jul 23, 2008 7:10 am    Post subject: Reply with quote

Yups OA is D, but how did u get that, I thot it should have been E coz I could find no way to get the area of the sector OAX. where X is the point of intersection of the diagonal and the circle.
Back to top


View user's profile Send private message
cubicle_bound_misfit
Really wants to Beat The GMAT!


Joined: 19 May 2008
Posts: 136

Thanks given: 1
Thanked 4 times in 4 posts

Location: Texaco Gas Station
Test Date: 06/30/2008
Target GMAT Score: 730

PostPosted: Wed Jul 23, 2008 7:43 am    Post subject: Reply with quote

you owe me one Smile http://www.beatthegmat.com/set-q-1-t14264.html#58978


for the semicircle lenght of sector pi*R

you have to substract the rest of the sector with inscribed angle 45 degree.


regards,

_________________
Cubicle Bound Misfit
Back to top


View user's profile Send private message
reachac
Moderator


Joined: 22 Feb 2008
Posts: 524

Thanks given: 1
Thanked 9 times in 9 posts


Test Date: 7th Aug
Target GMAT Score: 770
GMAT Score: 780

PostPosted: Wed Jul 23, 2008 9:36 am    Post subject: Reply with quote

Ohh u remember that question Smile, well had sent u a PM explaining my stance.

Nehw comin back to this question, how can u say that OAX is a quarter circle (or for that matter how can u say that the inscribed angle is 45 degree) I see no basis for this being provided by the question or the options.
Back to top


View user's profile Send private message
cubicle_bound_misfit
Really wants to Beat The GMAT!


Joined: 19 May 2008
Posts: 136

Thanks given: 1
Thanked 4 times in 4 posts

Location: Texaco Gas Station
Test Date: 06/30/2008
Target GMAT Score: 730

PostPosted: Wed Jul 23, 2008 11:05 am    Post subject: Reply with quote

I am not saying oax is. I am saying the rest of the thing is.
So OAX = (length of semicircle - sector that has an inscribed angle of 45 degs.)

regards,

_________________
Cubicle Bound Misfit
Back to top


View user's profile Send private message
Canman
Rising GMAT Star


Joined: 11 Jul 2008
Posts: 58

Thanks given: 0
Thanked 4 times in 4 posts


Test Date: 8/16/2008
Target GMAT Score: 730+

PostPosted: Wed Jul 23, 2008 11:43 am    Post subject: Reply with quote

I think the ans on Q1 is E

Stem: We need to find number presents to wrap and range of presents that can be wrapped in 1 hr based on number of clerks available to wrap presents, to determine sufficiency.

1) tells us # range of presents that can be wrapped in 1 hr but not # of presents - INSUFFICIENT

ex: 6 clerks can wrap 120-180 presents in 1 hour

2) tells us # range of presents but not # of clerks available - INSUFFICIENT

ex: 70(p+1)=9(20), 70p=110=total presents to wrap based on rate of 20 per hour, or it may be 70(p+1)=9(30), 70p=200=total presents to wrap based on rate of 30 per hour

1+2) INSUFFICIENT because we know the clerks can wrap up to 180 per hour but we don't know if the shoppers have 110 or 200 presents to wrap
Back to top


View user's profile Send private message
reachac
Moderator


Joined: 22 Feb 2008
Posts: 524

Thanks given: 1
Thanked 9 times in 9 posts


Test Date: 7th Aug
Target GMAT Score: 770
GMAT Score: 780

PostPosted: Wed Jul 23, 2008 8:41 pm    Post subject: Reply with quote

cubicle_bound_misfit wrote:
I am not saying oax is. I am saying the rest of the thing is.
So OAX = (length of semicircle - sector that has an inscribed angle of 45 degs.)

regards,


Well I'm really sorry but somehow I cannot see which 45 degree incribed angle are you referring to and how did you get measure of that angle. are you assuming that OX is perpendicular to AB, if yes then what basis?
Back to top


View user's profile Send private message
airan
Really wants to Beat The GMAT!


Joined: 13 May 2008
Posts: 126

Thanks given: 0
Thanked 2 times in 2 posts


Target GMAT Score: 750
GMAT Score: 710

PostPosted: Thu Jul 24, 2008 2:45 am    Post subject: Reply with quote

Asnwer for gift wrapping should be C ..
What is the OA ..and from next time onwards, pls avoid 2 questions in the same post...!

_________________
Thanks
Airan
Back to top


View user's profile Send private message
airan
Really wants to Beat The GMAT!


Joined: 13 May 2008
Posts: 126

Thanks given: 0
Thanked 2 times in 2 posts


Target GMAT Score: 750
GMAT Score: 710

PostPosted: Thu Jul 24, 2008 2:58 am    Post subject: Reply with quote

Assuming AC cuts the semicircle at X, we wud need angle AOX to find the area of the minor sector AX.
A similar diagonal DB will also cut the circle at X( it being a square on diameter).

Now the area of semicircle is= are of triangle AXB plus 2 small sectors.
Area of triangle AXB can be found ..as it will be right triangle ..Hence area of the shaded region can be found .

B gives the same info as A hence D.

_________________
Thanks
Airan
Back to top


View user's profile Send private message
Display posts from previous:   
Post new topic   Reply to topic    Beat The GMAT Forum Index -> GMAT Math -> Data Sufficiency All times are GMT - 8 Hours
Page 1 of 1

 
Jump to:  
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum
You cannot attach files in this forum
You cannot download files in this forum



"GMAT" and other GMAC™ trademarks are registered trademarks of the Graduate Management Admission Council™. The Graduate Management Admission Council™ does not endorse, nor is it affiliated in any way with the owner or any content on this website. The opinions expressed here are solely those of the author or those of the members of this website. Copyright © 2008 BTG Test Prep, LLC. Powered by phpBB © 2001, 2005 phpBB Group.