Welcome! Check out our free B-School Guides to learn how you compare with other applicants.
Login or Register
 

OG Question

This topic has 4 member replies
gmatblood GMAT Destroyer!
Joined
05 Jul 2011
Posted:
489 messages
Followed by:
5 members
Thanked:
28 times
OG Question Post Sat Apr 14, 2012 4:32 am
Elapsed Time: 00:00
  • Lap #[LAPCOUNT] ([LAPTIME])
    The development of a new jumbo rocket that is expected to carry the United States into its next phase of space exploration will be able to deliver a heavier load of instruments into orbit than the space shuttle and at a lower cost.

    (A) The development of a new jumbo rocket that is expected to carry the United States into its next phase of space exploration will be able to deliver a heavier load of instruments into orbit than the space shuttle and at a lower cost.
    (B) The development of a new jumbo rocket is expected to carry the United States into its next phase of space exploration and be able to deliver a heavier load of instruments into orbit at a lower cost than the space shuttle.
    (C) The new development of a jumbo rocket, which is expected to carry the United States into its next phase of space exploration, will be able to deliver a heavier load of instruments into orbit at a lower cost than the space shuttle.
    (D) A newly developed jumbo rocket, which is expected to carry the United States into its next phase of space exploration, will be able to deliver a heavier load of instruments into orbit than the space shuttle can, and at a lower cost.
    (E) A newly developed jumbo rocket, which is expected to carry the United States into its next phase of space exploration, will be able to deliver a heavier load of instruments into orbit than the space shuttle and to cost less.

    Need free GMAT or MBA advice from an expert? Register for Beat The GMAT now and post your question in these forums!
    GmatKiss GMAT Titan Default Avatar
    Joined
    26 Jul 2011
    Posted:
    2790 messages
    Followed by:
    41 members
    Thanked:
    205 times
    Target GMAT Score:
    700+
    GMAT Score:
    640
    Post Sat Apr 14, 2012 4:38 am
    Between D and E, IMO: D Smile



    Last edited by GmatKiss on Sat Apr 14, 2012 4:51 am; edited 1 time in total

    vikram4689 GMAT Titan
    Joined
    01 Nov 2009
    Posted:
    1324 messages
    Followed by:
    13 members
    Thanked:
    99 times
    Post Sat Apr 14, 2012 4:45 am
    Development cannot deliver instruments so A,B, and C are OUT.
    E is incorrect because "can" is required for proper comparison.

    IMO D

    _________________
    Premise: If you like my post
    Conclusion : Press the Thanks Button Wink

    Thanked by: spider
    sam2304 GMAT Titan
    Joined
    26 Apr 2011
    Posted:
    1239 messages
    Followed by:
    24 members
    Thanked:
    228 times
    Test Date:
    26/06/2012
    Target GMAT Score:
    720
    GMAT Score:
    680
    Post Sat Apr 14, 2012 6:24 am
    IMO D. I second vikram's explanation.

    _________________
    Getting defeated is just a temporary notion, giving it up is what makes it permanent.
    http://gmatandbeyond.blogspot.in/

    killer1387 GMAT Destroyer! Default Avatar
    Joined
    03 Apr 2011
    Posted:
    583 messages
    Followed by:
    4 members
    Thanked:
    52 times
    Post Sat Apr 14, 2012 6:57 am
    D should be correct

    Best Conversation Starters

    1 varun289 43 topics
    2 greenwich 30 topics
    3 sana.noor 22 topics
    4 guerrero 20 topics
    5 killerdrummer 18 topics
    See More Top Beat The GMAT Members...

    Most Active Experts

    1 image description Brent@GMATPrepNow

    GMAT Prep Now Teacher

    205 posts
    2 image description Anju@Gurome

    Gurome

    146 posts
    3 image description GMATGuruNY

    The Princeton Review Teacher

    145 posts
    4 image description Jim@StratusPrep

    Stratus Prep

    96 posts
    5 image description David@VeritasPrep

    Veritas Prep

    39 posts
    See More Top Beat The GMAT Experts