-
Target Test Prep 20% Off Flash Sale is on! Code: FLASH20
Redeem
This Problem is Work!
Raise your hand if you love rate and work questions. Theyre awesome, right? They tend to be fairly long, and the set-up is pretty complex, plus we get to build a table before we dive into the equations!
Oh, wait no those are all reasons why we cant stand these problems.
Give yourself approximately 2 minutes to try the below GMATPrep problem. When youre done, take a look at it again and ask yourself, Is there a better way to do this thing?
* "Pumps A, B, and C operate at their respective constant rates. Pumps A and B, operating simultaneously, can fill a certain tank in 6/5 hours; pumps A and C, operating simultaneously, can fill the tank in 3/2 hours; and pumps B and C, operating simultaneously, can fill the tank in 2 hours. How many hours does it take pumps A, B, and C, operating simultaneously, to fill the tank?(A) 1/3
(B) 1/2
(C) 2/3
(D) 5/6
(E) 1
Have you got an answer? Pick one anyway. Pretend its the real test: you cant keep going till you pick an answer.
(Aside: why am I insisting that you pick an answer? It doesnt matter this isnt the real test! Actually, it really does matter. If you cant make yourself pick a random answer right now, then youre going to hang on too long and waste time during the real test. Practice making yourself let go.)
Okay, back to our problem. Yuck. Not just two but three separate pumps, all presumably operating at different rates. Some pretty ugly numbers. This is not going to be fun.
Hmm. It seems like we need to figure out the individual rates of the three pumps. The three pieces of information would let us write three equations, and wed have three variables, so we could use simultaneous equations rules to find the rates for all three pumps. Then we can add them up to find out how long they take to do the job working together.
Lets see. First, lets label each pumps rate according to the pump name. Pump As rate is A, pump Bs rate is B, and pump Cs rate is C.
Together, A and B fill the tank in 6/5 hours; that is As time and Bs time add up to 6/5 hours. Remember the standard work formula: RT = W. If they take 6/5 hours to do 1 job, then their combined rate is R(6/5) = 1, or R = 5/6. As a shortcut, know that if a machine takes a certain length of time to do 1 job, you can just take the reciprocal of that time to find the rate. In this case, 6/5 hours to do the job becomes a rate of 5/6 per hour.
Pump As rate and pump Bs rate, then, add up to a combined rate of 5/6, for our first equation:
(EQN1) A + B = 5/6
Do the same thing with the other two pieces of info to get two more equations:
(EQN2) A + C = 2/3
(EQN3) B + C = 1/2
All right! Were getting somewhere. Now, our next step is to figure out how to solve for A, B, and C.
At this point, people will have used at least 30 seconds and probably closer to 60 and the really hard math is still to come. Who thinks theyre going to get through the rest of it in another minute? Okay, honestly, I probably would but I really dont want to. :) Theres got to be a better way!
What are we solving for again? We want to find the combined rate for all three pumps, or A + B + C. Instead of finding each one individually, can you think of a way to solve for that combination: A + B + C?
If youre not sure, take a minute to think about it before you keep reading.
Okay, try this: add all three equations together at once. Well end up with 2A + 2B + 2C = (5/6) + (2/3) + (1/2). Start simplifying.
2A + 2B + 2C = (5/6) + (4/6) + (3/6)
2A + 2B + 2C = 12/6
A + B + C = 6/6 = 1
If all three work together, theyll get the job done in 1 hour.
The correct answer is E.
What if you cant get through the math? How could someone make a reasonable guess on this problem. Take a little time to try to figure something out and then come back here and keep reading.
If A and B do the job in 6/5 of an hour, but we knock out pump B and substitute C instead, suddenly it takes 1.5 hours, so C must be slower than B. Likewise, A and C take 1.5 hours, but replace A with B and the time jumps to 2 hours, so B must be slower than A. The rates then are in this order: C < B < A.
Further, pump C must be significantly slower than A. It takes A and B about an hour to do the job, while B and C take 2 hours. Pump B is the same, but A swaps out for C and the time doubles!
The two faster pumps, A and B, need a little over an hour to finish the job. If the slowest, C, is added, thatll reduce the overall time. None of the answers is over 6/5 too bad. But keep thinking. If it takes the two faster ones a little over an hour to do the job, then adding the slowest pump isnt going to speed things up all that much. For instance, the slowest pump wont suddenly drop the entire job to only 1/3 of an hour! If that happened, then C would have to be the fastest pump.
Further, C has to be significantly slower than A, remember? So even 1/2 is probably too high. The answer is likely either C, D, or E. Pick one and move on.
Key Takeaways for Annoying Work Problems
(1) Sure, you can always set up those charts, write out all of the equations, and solve for each variable individually. But isnt there an easier way?!? Yes, most of the time there is. Study these enough in advance that you learn a bunch of shortcuts.
(2) For instance (and this applies to any algebra problem, not just a Work problem), when theyre asking us to solve for a combination of variables (in this case, A + B + C), consider whether you can solve for the whole combo at once rather than finding each individual value. Maybe you cant but at least think about it. :)
(3) Dont forget to study how to guess! Do you want to spend 4 minutes doing all of the annoying math on this one (with a high likelihood of making a mistake, because theres so much math to do)? Or do you want to admit that you havent found the easier way to do it and take 2 minutes to guess and move on? In this case, you could probably even save a little bit of time and still give yourself a 1/3 chance of getting it right!
* GMATPrep questions courtesy of the Graduate Management Admissions Council. Usage of this question does not imply endorsement by GMAC.
Recent Articles
Archive
- April 2024
- March 2024
- February 2024
- January 2024
- December 2023
- November 2023
- October 2023
- September 2023
- July 2023
- June 2023
- May 2023
- April 2023
- March 2023
- February 2023
- January 2023
- December 2022
- November 2022
- October 2022
- September 2022
- August 2022
- July 2022
- June 2022
- May 2022
- April 2022
- March 2022
- February 2022
- January 2022
- December 2021
- November 2021
- October 2021
- September 2021
- August 2021
- July 2021
- June 2021
- May 2021
- April 2021
- March 2021
- February 2021
- January 2021
- December 2020
- November 2020
- October 2020
- September 2020
- August 2020
- July 2020
- June 2020
- May 2020
- April 2020
- March 2020
- February 2020
- January 2020
- December 2019
- November 2019
- October 2019
- September 2019
- August 2019
- July 2019
- June 2019
- May 2019
- April 2019
- March 2019
- February 2019
- January 2019
- December 2018
- November 2018
- October 2018
- September 2018
- August 2018
- July 2018
- June 2018
- May 2018
- April 2018
- March 2018
- February 2018
- January 2018
- December 2017
- November 2017
- October 2017
- September 2017
- August 2017
- July 2017
- June 2017
- May 2017
- April 2017
- March 2017
- February 2017
- January 2017
- December 2016
- November 2016
- October 2016
- September 2016
- August 2016
- July 2016
- June 2016
- May 2016
- April 2016
- March 2016
- February 2016
- January 2016
- December 2015
- November 2015
- October 2015
- September 2015
- August 2015
- July 2015
- June 2015
- May 2015
- April 2015
- March 2015
- February 2015
- January 2015
- December 2014
- November 2014
- October 2014
- September 2014
- August 2014
- July 2014
- June 2014
- May 2014
- April 2014
- March 2014
- February 2014
- January 2014
- December 2013
- November 2013
- October 2013
- September 2013
- August 2013
- July 2013
- June 2013
- May 2013
- April 2013
- March 2013
- February 2013
- January 2013
- December 2012
- November 2012
- October 2012
- September 2012
- August 2012
- July 2012
- June 2012
- May 2012
- April 2012
- March 2012
- February 2012
- January 2012
- December 2011
- November 2011
- October 2011
- September 2011
- August 2011
- July 2011
- June 2011
- May 2011
- April 2011
- March 2011
- February 2011
- January 2011
- December 2010
- November 2010
- October 2010
- September 2010
- August 2010
- July 2010
- June 2010
- May 2010
- April 2010
- March 2010
- February 2010
- January 2010
- December 2009
- November 2009
- October 2009
- September 2009
- August 2009